Usage of Shanghai Yetuo Freeze Drying Machine
release time:2022-09-28  |  Browse:3018

Before each startup, first check if the pump oil in the vacuum pump is sufficient.

2. Unscrew the drain valve and let the remaining water flow out. After draining, tighten the valve.

3. Check if the contact part between the freeze-drying chamber and the cold trap is intact, clean and readjust if necessary.

4. Close all valves (valves directly connected to the freeze-drying bottle, with the white knob facing upwards indicating closure). Close the valve connecting the cold trap to the vacuum pump (located behind the instrument and connected to the vacuum tube).

5. Turn on the power switch of the cold trap and the power switch of the vacuum pump.

6.15 minutes later, open the valve connecting the cold trap to the vacuum pump.

After 7.1 minutes, the pre frozen sample (already in the freeze-drying bottle) can be hung on the bracket, and the corresponding valve can be opened to start the freeze-drying process.

After freeze-drying, close the corresponding valve (with the white knob facing upwards) and remove the freeze-drying bottle.

9. After all freeze-drying bottles are removed, turn off the power supply of the vacuum pump and the cold trap in sequence.

10. After the frost in the cold trap melts, open the drain valve for drainage and then close it.

matters needing attention

1. Before freeze-drying, the sample must first undergo pre freezing, and the sample must be in a solid state (frozen state) before freeze-drying. The longer the pre freezing time, the better the freeze-drying effect. The volume of the sample should not exceed one-third of the volume of the sample bottle.

2. If the sample melts during freeze-drying and the vacuum pump and cold trap are in good working condition, the reason is that the vacuum degree is insufficient and there are air leaks. Please check if all valves are closed, if the contact area between the freeze-drying chamber and the cold trap surface is sealed, and if necessary, clean the sealing rings on the cold trap surface and freeze-drying chamber.

3. Regularly clean the cold trap chamber and freeze-drying chamber.

4. Freeze drying can only be done 15 minutes after startup, in order to pre cool the cold trap and preheat the vacuum pump. Only in this way can the instrument work in a working state.

After the freeze-drying is completed and the valve is closed, the interior of the freeze-drying bottle is connected to the outside. After the air pressure is balanced, the bottle can be removed. 6. Regularly clean the dust inside the compression bottle, and add oil to the vacuum pump when the oil is low


7585b2b28e16caf6b1d810822a50759.jpg

Previous:Working principle, composition, application, operation and maintenance points of Shanghai Yetuo expe     Next:How to choose the Shanghai Yetuo pilot freeze-drying machine in different application scenarios?
Follow us
Mobile station
  • Mobile:19961895916
  • Tel:19961895916
  • WeChat Account:上海葉拓科技
  • Email:yetuo@sh-yetuo.com
  • Address:C2-301, green window, No. 4, Lvdu Avenue
Copyright? 2025 Shanghai Yetuo Technology Co., Ltd  ICP備案號:滬ICP備20000740號-3 主站蜘蛛池模板: 久久精品二区亚洲w码 | 大香伊蕉在人线视频777 | 国产精品.xx视频.xxtv | 一级大片免费观看 | 欧美成人精品一区二区三区 | 亚洲91| 久久精品欧美一区二区三区不卡 | 日韩精品小视频 | 久久精品视频亚洲 | 欧美日韩综合一区 | 精品久久国产 | 毛片网站大全 | 天天摸夜夜操 | 午夜天堂精品久久久久 | 免费亚洲一区二区 | 久久成人视屏 | 亚洲欧美在线综合 | 久久久精品国产 | 亚洲国产精品一区二区三区 | 国产成人精品一区一区一区 | 国产一区二区三区久久久 | 国产九九av | 精品国产一区二区三区免费 | 国产伦精品一区二区 | 你懂的免费在线观看 | 一区二区三区欧美在线 | 香蕉视频成人在线观看 | 国产精品久久a | 九九亚洲视频 | 亚洲精品国产二区 | 日本五月婷婷 | 亚洲精品一区二三区不卡 | 久久精品国产v日韩v亚洲 | 高清一区二区三区 | 国变精品美女久久久久av爽 | 国产日韩欧美综合 | 大陆一级毛片免费视频观看 | 久久精品色欧美aⅴ一区二区 | 日韩av在线一区二区三区 | 国产高清精品一区二区三区 | 国产精品成人一区二区三区夜夜夜 |